Electrical Engineering For Your Water And Wastewater Projects
Contact US

TLS Engineering LLC provides design, bidding, and construction phase electrical engineering consulting services for packaged wastewater treatment plants. 

TLS begins a packaged wastewater treatment plant project by confirming the project details, including the important deadlines, motor details, Owner/Operator preferences and standards, back-up power system preference, and remote monitoring/control preference. TLS coordinates with the packaged wastewater treatment plant's manufacturer/designer, to confirm their scope, control panel details, and motor information. The design phase starts with calculating the electrical load and coordinating with the local electric utility company to ensure the required ampacity and voltage are brought to the site. TLS develops a design drawing set including equipment specifications, an electrical site plan, a one-line diagram, SCADA Panel details, and electrical details. The packaged wastewater treatment plant's back-up power system is designed based on the project requirements, with the following details taken into consideration: permanent versus portable generator, natural gas versus diesel fuel, and Owner's preferred generator manufacturer.

Early in the design process TLS coordinates with the Owner/Operator to ensure their design standards and preferences are implemented within the electrical and controls design. These preferences typically include the level control strategy, means of alarm communication (autodialer versus SCADA Panel), and generator manufacturer. When an Owner has an existing SCADA (Supervisory Control And Data Acquisition) system, TLS coordinates closely with the Owner's Systems Integrator to ensure the packaged wastewater treatment plant's SCADA Panel will be compatible with the existing SCADA system and is monitoring/controlling all desired I/O points.

When the project goes out for bids, TLS Engineering will provide bid phases services, including responding to RFIs and issuing addenda as required. 

When the project enters the construction phase, TLS will perform submittal review, respond to RFIs, perform a final site inspection, create a punch list of items for the Contractor to resolve, and complete the record drawings based on any changes to the original design drawings.

Featured Projects
Williamson County MUD No. 44 Wastewater Treatment Plant
Weir, Texas
Read more