Electrical Engineering For Your Water And Wastewater Projects
Contact US

TLS Engineering LLC provided electrical engineering consulting services for the Williamson County MUD No. 44 Wastewater Treatment Plant - Phase 1 project in Weir, Texas. 

TLS calculated the electrical load and coordinated with the local electric utility company, Oncor Electric Delivery Company and designed the electrical service distribution. The scope included providing an electrical site plan layout, designing the grounding and surge suppression systems, and site lighting. Throughout the design process, TLS closely coordinated with the packaged wastewater treatment plant designer, AUC Group. This project included selecting a 300kW diesel generator to provide backup power at the wastewater treatment plant site.

TLS specified a cellular monitoring system for data, reports, and critical alarm notifications.